Contract Win ! P&O Ventura - Dry Dock February 2026

AMI are excited to announce succefully securing a considerable package aboard P&O Ventura for Dry Docking in Rotterdam in February 2026.

The project covers the public spaces and includes;

  • Extensive ceramic tiling including the Atrium and barfronts.
  • Teak refurbishment.
  • Curtains and blinds.
  • Re-upholstery - including the Theatre.
  • Carpet and vinyl installtion.
  • Deckheads and bulkheads.
  • Electrical and lighting upgrades.
  • Canopy above the Breakers Bar.
  • Decorative upgrades - including paint, vinyl and wall coverings.
  • Catering upgrades to the buffet line.
  • Surface repairs.
  • French polishing.