Contract Win ! P&O Ventura - Dry Dock February 2026
AMI are excited to announce succefully securing a considerable package aboard P&O Ventura for Dry Docking in Rotterdam in February 2026.
The project covers the public spaces and includes;
- Extensive ceramic tiling including the Atrium and barfronts.
- Teak refurbishment.
- Curtains and blinds.
- Re-upholstery - including the Theatre.
- Carpet and vinyl installtion.
- Deckheads and bulkheads.
- Electrical and lighting upgrades.
- Canopy above the Breakers Bar.
- Decorative upgrades - including paint, vinyl and wall coverings.
- Catering upgrades to the buffet line.
- Surface repairs.
- French polishing.